2017


Lids - New Sudbury Shopping Centre

 

Renovation and update to the existing Lids store in the New Sudbury Shopping Centre.  Scope of work was made up of removal and replacement of new finishes, signage, lighting, and installation of slot walls for merchandise.

 

Children's Aid Society - Interior Renovations

 

Interior renovation throughout three floors of the Children's Aid building on Lasalle Blvd. in Sudbury.  The renovation was comprised of five phases  of work to ensure the building could continue operating with minimum disruption due to construction.  The work introduced updated finishes and created new work areas for the staff and clients.

 

2016


Noojmowin Teg Health Centre - Addition and Renovation (Aundeck Omni Kaning First Nation) 

 

Addition to an existing health centre as the second phase to the original project..  The additional is approximately 7000 s.f. with offices and exam rooms throughout along with a round traditional healing room.

 

 

 

 

West Nipissing Police - Interior Renovation - Phase 2 (Sturgeon Falls)

 

This second phase of this project was and interior renovation and expansion of space for a police department.  Crime science and security equipment was largely why the new areas were created .

 

 

2015


Golder & Associates— Lab and Office Renovations (Sudbury) 

 

The interior of an existing 17,000 sf. building was decommissioned and then completely reconstructed into a 13,000 sf. office space and 5,000 sf. Laboratory.  Specialty testing equipment, lab casework and a technical mechanical system was required for the users of the spaces.

 

Multi-Ministry Office Consolidation—Office Renovation - (Sudbury) - 2015

 

Areas within 6 of 7 floors in this office building have been  demolished and then reconstructed to meet ministry requirements.  This building was fully occupied throughout the construction process and was completed in three phases to keep the building fully operational. 

Chelmsford Arena - Interior Renovation Phase 2 - (Sudbury) - 2015

 

The interior of the arena was completely removed in phase 1.  In Phase 2 we built the interior of the arena from ground up.  Beginning from new mechanical piping in the soil to precast bleachers, rink boards and finishes throughout. 

Rivet Insurance - Interior Renovation (Sudbury) 

 

Two floors of an existing Three storey building was demolished and then rebuilt to house a new insurance tenant.  Finishes consisted of PC350 fully glazed, carpet tile, LED lighting and high end millwork throughout.

West Nipissing Police—Phase 1 - (Sturgeon Falls)

 

Administration and office area of  the West Nipissing Police department was fully renovated  to create new spaces and an updated design.  The area featured many high security items that were incorporated into the project.

Eastlink/Hydro One—Renovations and Tenant Space Fit-Up - (Sudbury) 

 

An area of an existing building was separated to create a tenant space. The Owners(Eastlink) area was renovated to create new areas.  The tenant space was constructed to Hydro One ‘s Design.

 

 

2014


885 Regent - Elevator Shaft and Interior Renovation - (Sudbury)

 

An exterior elevator shaft, curtain wall and interior renovations were completed for the revamping of a prominent building in Sudbury, now with new owners.  The Interior renovation created rental space on multiple floors.

 

 

HSN LINAC - Accelerator Cancer Bunkers - (Sudbury)

 

Interior renovations to Cancer Centre Linear Accelerator Replacement, Bunkers 1,2 & 3, worked within Infectious Control regulations.  Large sliding Lead doors were installed at the entrances to each new bunker where new state of the art medical equipment was installed. During the construction, surrounding area were in full operation and all activities were strategically coordinated to ensure the daily operation of this area of the hospital is not impacted.

Life Labs - Tenant Fit-Up - (Val Caron)

 

This renovation took place within a strip mall for a new tenant fit up.  The area was completely demolished then rebuilt to house the exam room and medical type space.

 

Canadian Hearing Society - (North Bay)

 

This renovation took place within an existing building in north bay.   All existing components inside of the space were removed and the new space was constructed to meet client requirements and organization specifications.

2013


TD Bank - Interior Renovations - (Sudbury)

 

Interior renovation was completed for an expansion of a bank branch.  The construction was completed in 2 phases while building was occupied.   The finishes were high end and were dispersed  throughout the banking equipment which was mounted as per TD Bank specifications.

 

Mid-City Warehouse - (Sudbury)

 

A Pre-Engineered building was supplied and installed for a one storey building with a large mezzanine area for offices.  We also supplied and installed a large stair connecting the main storage area with the mezzanine  we then finished the rooms and fire separations throughout the building.

 

2012


Tree View Homes - (Sudbury)

 

Three wood frame buildings were constructed from the ground up.  These  buildings were used as a group home and were entirely barrier free along with many lifts for care.  The project had a short completion schedule to keep on track with the owners strict timelines

 

 

T&G Warehouse - (Sudbury)

 

Erection of a new building from ground up using a pre engineered structure.  The space included multiple open bays and storage rooms.  The scope was from the concrete right through to the finishing and sign off on the construction. 

2011


United Steelworkers Hall - (Sudbury)

 

Interior renovation was completed beginning with the demolition and decommission of an old grocery store.  The buildings new purpose requires new offices and large halls to house groups of people for demonstrations and meetings.  

MTI Training Centre - (Sudbury)

 

Erection of a new building was completed from the ground up.  The structure was pre-engineered along with cladding for roof and siding.  The building had large bays and multiple meeting rooms which is used as a mining training centre.